A supplier audit is not a tour of a tidy workshop. It is an attempt to answer one question with evidence: can this organisation repeatedly produce conforming parts, and will it still be doing so eighteen months from now? Buyers often leave an audit with a feeling rather than a comparable result, which makes a shortlist of three suppliers impossible to rank. This article turns the visit into a weighted scorecard, lists the evidence to ask for under each heading, names the findings that should stop an approval regardless of the total score, and shows how to run the same exercise remotely.
What an audit is really measuring
Machines and floor space are easy to see and easy to over-weight. A clean, well-lit shop tells you about housekeeping; it tells you very little about whether the fourth batch will match the first. What matters is the system that sits behind the parts: how a drawing revision reaches the machine, how a measuring device is kept in calibration, how a nonconforming part is segregated, and how a change of material supplier gets approved before it reaches your order.
So frame the audit around repetition. For every area, ask to see two examples from different dates, and follow one part backwards from a finished shipment to the material lot, the program version, the inspection record and the person who signed the release. A supplier with a working system can do that in minutes. One without it will show you the machine instead. That single exercise reveals more than a checklist of equipment, and it is the same logic behind the traceability requirements in a first article inspection package.
The weighted scorecard
Use one sheet per supplier, with the same weights and the same evidence requests for each. Score each line from 0 to 5: 0 means no evidence, 3 means a documented process with gaps, 5 means a documented process with records from multiple dates that can be traced end to end. Multiply by the weight and total out of 100. The numbers matter less than forcing the same questions in the same order on every visit.
| Area | Weight | Evidence to request | What a score of 5 looks like |
|---|---|---|---|
| Document and revision control | 15 | Drawing register, revision history, how obsolete prints are removed from the floor | Current revision at every workstation, with a dated change record and no superseded prints in use |
| Equipment and process capability | 10 | Machine list, maintenance log, process routing for a representative part | Routings tied to part numbers, planned maintenance recorded, capacity assumptions written down |
| Measurement and calibration | 15 | Gauge register, calibration certificates and due dates, CMM programs | Every instrument has a valid certificate; measurement method stated on the inspection plan |
| Batch traceability | 15 | Material certificates, lot linking, travel documents for one finished batch | A finished part can be traced to its material lot, program, fixture, operator and inspection record |
| Change management | 15 | Change request log, approval workflow, customer notification records | Process, material, finisher or subcontractor changes are approved and notified before they take effect |
| Nonconformance and corrective action | 15 | NCR log, segregation area, root cause records, verification of closure | Issues are contained, analysed, corrected and checked for recurrence with dated evidence |
| Delivery and complaint history | 10 | On-time delivery record, complaint log, response times, repeat issues | Trends are measured and recurring complaints have been addressed rather than just closed |
| Subcontractor control | 5 | Approved finisher list, incoming records from subcontracted operations | Outsourced processes are qualified and their records arrive with the parts |
Two areas carry more weight than buyers expect. Change management is where long-running programmes usually fail: a finisher changes, a tool is replaced, a program is re-posted, and nobody tells the customer until two batches no longer match. Our batch consistency guide sets out the mechanisms. Nonconformance handling is the other one — a supplier with no recorded nonconformances usually has no logging system rather than no problems; more often nothing is being recorded at all.

Red flags that outweigh the total score
A high score in the table should not rescue a supplier if any of the following appear. Treat them as gates to be resolved before approval, not as deductions from a total.
- Calibration records that cannot be produced for the instruments used on your part. Every measurement in a report depends on this; without it the report is unverifiable.
- No way to link a finished part to a material lot. If traceability is a requirement of your programme, this is a hard stop rather than a training issue.
- Obsolete drawing revisions still available at workstations. The next order can be made to the wrong print, and no amount of final inspection reliably catches it.
- Subcontracted special processes with no incoming records. Heat treatment, plating and coating cannot be verified by looking at the finished part.
- Verbal change approvals, or changes notified after shipment. This is the single biggest predictor of cross-batch variation.
- Quarantine areas that are empty by policy rather than by circumstance. Ask what happened to the last nonconforming part and follow the paper.
- Records assembled for the audit date only. Ask for the same evidence from six months ago.
Where a finding concerns certification or a programme-specific qualification, do not guess at the answer. Our quality management system is certified to ISO 9001:2015 (certificate IAS24Q374R0, scope: production of hardware components), issued by an IAF-accredited certification body. Any further certificate, industry approval or customer-specific document should be confirmed in writing at quotation stage, including which party issues it and in what form. That turns an assumption into an agreed deliverable, which is how the document package is handled in our quotation breakdown.
Running the same audit remotely
A remote audit can cover most of the scorecard if it is structured as evidence review plus a live walk-through, rather than as a video call and a slide deck. Ask for the document set in advance, then use the call to follow one part through the system with screen sharing: open the drawing register, the material certificate, the routing, the inspection record and the release signature in sequence. Request a live, unedited camera walk from goods-in through metrology to dispatch, including the calibration labels on the instruments that would measure your part.
| Area | On-site evidence | Remote substitute |
|---|---|---|
| Equipment list | Walk the machine line | Dated asset register plus a continuous video walk with serial numbers visible |
| Calibration | Read labels on instruments | Certificate scans with due dates, cross-checked against the gauge register |
| Traceability | Follow a batch physically | Screen-shared document chain for one shipped lot, from certificate to release |
| Nonconformance | Visit the quarantine area | NCR log plus photographs of the last three contained parts and their closure records |
| Housekeeping and handling | Observe packing and storage | Live camera walk of storage, finishing and packing areas |
What a remote audit cannot fully replace is the informal signal: how people handle an unexpected question, whether the floor matches the documents, how parts are actually protected between operations. If the scorecard result is close between two candidates, an on-site visit for the finalists is worth the trip. For a first-pass shortlist, though, remote evidence review is a legitimate filter and much cheaper than three plant visits.

From the score to a decision
Agree the decision bands before the first audit, so the numbers cannot be reinterpreted afterwards. A workable three-way split:
- Approved (typically 80+ with no red flags). Enter the approved supplier list; set a review interval and agree the document package that ships with each order.
- Conditional approval (65–79, or any single area below half marks). Name the gaps, the corrective action, the owner and a date. Limit the initial order to a quantity and a part family that do not depend on the weak area, and re-score before widening the scope.
- Not approved (below 65, or any unresolved red flag). Record the reason and the re-audit conditions. A supplier who closes the gaps within a defined period can be re-scored; a supplier who disputes the findings usually cannot.
Keep the completed scorecard. Twelve months later it is the baseline for a re-audit, and it is far more useful than a note saying "good facility". It also gives the commercial conversation a shared language: the questions worth asking before choosing a metal parts manufacturer are largely the ones the scorecard turns into evidence requests, and the general guidance on selecting a machining partner covers the commercial side that a quality audit does not.
What the audit does not tell you
An audit describes a system at a point in time, not the quality of a specific part. It cannot replace a first article inspection, a dimensional report review or incoming verification on the parts you actually receive; those are separate gates described in our guide to reading a dimensional inspection report and in the overview of metal part inspection levels. Nor does a score tell you whether a supplier can meet your date — the schedule side belongs in the stage-by-stage lead time discussion, and the price side in the machining cost breakdown.
Used this way, the scorecard is a filter rather than a verdict. It removes the suppliers whose systems cannot support repeat work, and gives you a documented reason for the ones that remain. For programmes with industry-specific requirements, the industry requirements overview is a useful companion when deciding which evidence to weight more heavily.
Preparing for the visit
Most of the value of an audit is decided before anyone arrives. Send the evidence request at least a week ahead, along with the scorecard itself, so the supplier knows which records will be examined and can have the right people in the room. State clearly what the audit covers and what it does not: a quality system review is not a commercial negotiation, and mixing the two tends to produce vague answers to specific questions. Ask for a quality representative, someone from production engineering and, where finishing is subcontracted, the person who manages that supplier relationship.
The advance document pack should be short and concrete. Request the drawing register and revision history, the gauge register with calibration dates, a recent nonconformance log with closure records, a material certificate and the inspection report for one shipped batch, the approved subcontractor list, and the change request log for the last twelve months. Ask for two examples from different dates in each category. A single set of records prepared specifically for the audit day is less informative than ordinary records from routine production, and asking for a historical example is the simplest way to tell the difference.
Allocate the time deliberately. A useful half-day spends perhaps twenty minutes on the floor and the rest following documents: trace one part backwards, open a nonconformance record and follow it to closure, check that a change request was approved before it took effect, and compare the calibration certificate on the instrument that measured your part with the due date in the register. Walking the machine line is worth doing, but it is the part of the visit most likely to be rehearsed.
Record evidence as you go, not afterwards. Note the document number, its date and where it was seen against each scorecard line; that turns a subjective impression into a score another colleague can review. Close the visit by reading back the findings in the room, separating confirmed gaps from questions still open, and agreeing who will send what and by when. A scorecard completed from memory a week later is a different document, and a much less defensible one. The same evidence discipline is what makes a first article package useful at the release gate.
How long should a supplier quality audit take?
A focused on-site audit of a machining supplier usually fits into half a day if the document set is requested in advance. The time is spent following one part through the system and checking records from two different dates, not touring every machine. A remote evidence review is shorter, but allow time for the live walk-through as well.
Should a low score on one area be averaged out?
No. Treat calibration gaps, missing material traceability, obsolete drawings in use and unrecorded subcontracted processes as gates. A high total elsewhere does not compensate for a system that cannot produce verifiable evidence on your part.
What is the single most useful question to ask?
Ask to follow one shipped batch backwards to its material lot, program version, fixture, inspection record and release signature. A supplier with a working system can do it quickly; one without it will redirect the conversation to equipment.
Can a remote audit replace an on-site visit?
For a first-pass shortlist, yes, if it is structured as document review plus a live, unedited walk-through and a screen-shared traceability chain. For two finalists with close scores, an on-site visit is still worth it to see handling, housekeeping and how unexpected questions are dealt with.
How often should an approved supplier be re-audited?
Set the interval when you approve them, and re-score sooner after a change of ownership, a new facility, a new process, or a quality incident. Keep the original scorecard as the baseline so the re-audit measures change rather than starting from a fresh impression.